Electrical modeling of wind turbines
In order to accurately determine wind turbines responses to events that take place on the grid, its electrical behavior is studied. Furthermore, to ensure the reliability of the wind turbine simulation models, the IER has a test bench composed by two 30 kVA electric generators, in addition to a pilot plant of 2 MW that is currently being built.